
Hinchliffe · Commercial
Commercial surfacing across Cheshire.
Plan surfacing around the way your site operates. Hinchliffe reviews vehicle use, pedestrian routes, drainage, access and the proposed programme before defining the construction and responsibilities in a written proposal.
Structure First. Surface Second.
Site review
Use, loading and existing construction checked
Written scope
Allowances, exclusions and responsibilities
Samples
See products before they are specified
Direct contact
Talk to Dan, who prices the work
A defined scope
Preparation, surface construction and exclusions set out before commitment.
Direct communication
Discuss your brief and outstanding decisions with Dan.
A considered programme
Review access, sequencing and site constraints alongside the work itself.
Working with Hinchliffe
Who we help.
Planning a scheme
Clients, designers and managing agents who need surface, edging and drainage options explained against the brief before anything is specified.
On site
Main contractors and developers who need a package priced against drawings, with interfaces, access and programme agreed up front.
Project routes
Start with your site.
Define the package
A clear brief. An agreed scope.
Surface construction
Discuss tarmac, asphalt, block paving or resin bound against the intended use and existing base—not appearance alone.
Groundworks & drainage
Identify preparation, edge restraints and drainage interfaces, including responsibility for work outside the surfacing package.
Contractor enquiries
Send drawings and a specification for review. Clarifications, delivery requirements and any proposed alternatives are agreed before a quotation.
Before a proposal
The site requirements shape the package.
Structure First. Surface Second. Review loading, retained construction, water routes and interfaces with work by others before agreeing the surface. Dan will clarify what is included, who is responsible and which decisions remain outstanding.
- Existing construction, ground conditions and areas to retain
- Pedestrian use, vehicle loading and turning movements
- Levels, falls, drainage outlets and thresholds
- Site access, operating hours and work by others
- Drawings, tender deadlines and handover requirements

From scope to handover.
- 01
Review
Site location, intended use, loading and existing construction.
- 02
Specify
Agreed preparation, drainage interfaces, surface and exclusions.
- 03
Programme
Access, phasing and required dates reviewed before commitment.
- 04
Handover
Record the agreed work and provide relevant aftercare guidance.
Project questions.
Can we discuss a main contractor or tender package?
Yes. Use Submit a Tender Enquiry to share the brief, deadline and supporting documents. The enquiry starts a scope review; it does not confirm acceptance of the package.
Can surfacing be planned around an occupied site?
Tell us which access routes and activities must continue. Phasing and any alternative routes need to be reviewed and agreed before a programme is committed.
What should we send with an enquiry?
Send the site location, intended use, approximate area, drawings or specification, and required dates. Identify work by others and any tender deadline so the review starts with a clear brief.
Is a date confirmed when we enquire?
No. Scope, access arrangements and the proposed programme need review before dates are agreed. Tell Dan about fixed deadlines at the outset.
A quotation against a defined scope.
Send the drawings, specification and programme available. We review preparation, surfacing, drainage interfaces, access and work by others, then identify the inclusions, exclusions and outstanding clarifications.
Ask Dan about relevant project experience and the information available for your proposed package.
Discuss your site with Dan.
01270 36 1111dan@drivewaysbyhinchliffe.com
Share the site location, intended use, approximate scope and required dates. We'll review the information and agree the next step.
