HIG Residential — Premium Paving Systems
Roller compacting a stone sub-base on a Hinchliffe project

Hinchliffe · Commercial

Commercial footpaths

Connect entrances and shared areas with a surface suited to the route. We review the supplied layout, widths, levels, drainage and access arrangements before agreeing the work.

Structure First. Surface Second.

Joined-up levels

Review entrances, thresholds and connections along the whole route.

Defined surface choice

Match the finish to the route's use and maintenance needs.

Clear boundaries

Record which edges, drainage connections and adjoining areas are included.

Define the package

A clear brief. An agreed scope.

Route & connections

Share the layout and accessibility brief. Required gradients, widths and crossfalls should be confirmed by the responsible designer where specialist design is needed.

Surface & support

Consider asphalt, block paving or resin bound alongside the supporting construction and edging. Material selection follows site review.

Working around access

Identify pedestrian movements and any routes that cannot close. Agree temporary routes and phasing alongside the scope and access plan.

Before a proposal

The site requirements shape the package.

Structure First. Surface Second. Review loading, retained construction, water routes and interfaces with work by others before agreeing the surface. Dan will clarify what is included, who is responsible and which decisions remain outstanding.

  • Route width, gradients, crossfalls and thresholds
  • Pedestrian use and client accessibility requirements
  • Existing base, tree roots and nearby services
  • Surface water routes and edge restraints
  • Public access, closures and alternative routes
Roller compacting a stone sub-base before surfacing
Ground preparation before the finished surface.

From scope to handover.

  1. 01

    Review

    Site location, intended use, loading and existing construction.

  2. 02

    Specify

    Agreed preparation, drainage interfaces, surface and exclusions.

  3. 03

    Programme

    Access, phasing and required dates reviewed before commitment.

  4. 04

    Handover

    Record the agreed work and provide relevant aftercare guidance.

Project questions.

Does resin bound make a path permeable?

Not by itself. Water movement depends on the complete construction, supporting layers, ground conditions and drainage design.

Can the route stay open during work?

Do not assume so. Closure requirements, alternative routes and phasing need to be agreed for the particular site.

What should we send with an enquiry?

Send the site location, intended use, approximate area, drawings or specification, and required dates. Identify work by others and any tender deadline so the review starts with a clear brief.

Is a date confirmed when we enquire?

No. Scope, access arrangements and the proposed programme need review before dates are agreed. Tell Dan about fixed deadlines at the outset.

A quotation against a defined scope.

Send the drawings, specification and programme available. We review preparation, surfacing, drainage interfaces, access and work by others, then identify the inclusions, exclusions and outstanding clarifications.

Ask Dan about relevant project experience and the information available for your proposed package.

Discuss your site with Dan.

01270 36 1111dan@drivewaysbyhinchliffe.com

Share the site location, intended use, approximate scope and required dates. We'll review the information and agree the next step.

CallDiscuss Your Project